Cycle Stop Valves
Pump System Questions and Answers => Pictures and Cad drawings of pump systems => Topic started by: Dennis Haney on September 10, 2009, 10:17:16 AM
-
300 GPM lead/lag set up with two 2" CSV's for two 150 GPM submersibles out in a pond or a 300 GPM set up with one 3" CSV for one 300 GPM submersible out in a pond.
(http://forum.cyclestopvalves.com/forum/files/falcon_ridge_golf_club_web_plan_2_inch_112.jpg)
(http://forum.cyclestopvalves.com/forum/files/falcon_ridge_golf_club_web_plan_3_inch_181.jpg)