Cycle Stop Valves
Pump System Questions and Answers => Valve Tech => Topic started by: stvnwhite on May 07, 2023, 03:18:38 PM
-
Hello -
I have 1" line coming off my submersible but 1-1/4" line on distribution lines. During an initial piping setup, does the CSV care if I go directly into it with 1" (internal threads) and exit with 1-1/4" (using the external threads) or should I transition farther from the valve itself ? If so, on the upstream or downstream side of the valve?
Thanks
-
The CSV1A is dual threads so you can do just that. Use either thread on either end. Enjoy!