Getting ready to install a CSV1A and I was wondering if there is any requirement for straight piping before and/or after the valve before going into the pressure tank? Can I just thread a 90 Elbow directly onto the CSV1A input side or should there be a length of straight piping to reduce turbulence and pressure variations? Likewise for the exit side going into the pressure tank?
Thanks