Frequently Asked Questions / Re: Going to bite the bullet, drill a new well & use CSV.
« on: November 06, 2026, 07:55:27 AM »
Well was finished last night with only a 15 minute bale to get an idea of gpm. 1 hour bale will be done today.
Well is 105' deep with 6" steel pipe. Static water at beginning of day was 51' when well depth was 93". I do not know what static depth was when we hit 105' last night.
12 gal baler x2 every 67 seconds with 0" draw down.
Water was clearing up pretty fast, but still had sediment after 15 minutes. Should clear up nicely when we hook up the pump.
Based on sound of baler hitting water and soapstone mark on cable, at 15 minutes it appeared that water level was actually raising from when we started test.
When test began, soapstone mark was at top of pipe when we heard baler hit water and after 15 minutes of baling, the soapstone mark was a couple inches above pipe when we heard baler hit the water.
After decades of a low producing well, it will be quite a blessing having tens of gpm of water on hand,
Well is 105' deep with 6" steel pipe. Static water at beginning of day was 51' when well depth was 93". I do not know what static depth was when we hit 105' last night.
12 gal baler x2 every 67 seconds with 0" draw down.
Water was clearing up pretty fast, but still had sediment after 15 minutes. Should clear up nicely when we hook up the pump.
Based on sound of baler hitting water and soapstone mark on cable, at 15 minutes it appeared that water level was actually raising from when we started test.
When test began, soapstone mark was at top of pipe when we heard baler hit water and after 15 minutes of baling, the soapstone mark was a couple inches above pipe when we heard baler hit the water.
After decades of a low producing well, it will be quite a blessing having tens of gpm of water on hand,