Ok tell me if this is right please. Out of well with 1 1/4", next a union, next check valve, next 1 1/4 Tee, then a cut-off going same direction. Then from Tee, pressure relief valve, next gonna put a hose bib(??), next pressure gauge/pressure switch, and finally the tank. Any suggestions/corrections on the order of or if needed much appreciated! Thanks!!